JAEA Reports

Measures of closing report of outside waste storage pits separate volume part II; Data collections about measurement of contamination and measurement after decontamination in outside waste storage pits

; Sukegawa, Yasuhiro*; Suzuki, Satoshi*; Yoshida, Michihiro; ; *; Miyo, Hiroaki

JNC TN8440 2000-022, 180 Pages, 2000/10

JNC-TN8440-2000-022.pdf:12.16MB

At outside waste strage pits, containers for strage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Technology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessary instruments started. Decontamination of the pits started from the beginning of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the dircumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition to above, the amount of concrete poured into the pits was about 1,200 m$$^{3}$$. These data compiled the inspection of contamination in measures of closing of the pits.

JAEA Reports

Measures of closing report of outside waste storage pits; Separate Volume Part I; Photographs sbout improvement step of outside waste storage pits

Yoshida, Michihiro; Suzuki, Satoshi*; Sukegawa, Yasuhiro*; Miyo, Hiroaki

JNC TN8440 2000-021, 180 Pages, 2000/10

JNC-TN8440-2000-021.pdf:42.37MB

At outside waste storage pits, containers for storage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Thechnology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessaly instruments started. Decontamination of the pits started fiom the beginning of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the circumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition to above, the amount of concrete poured into the pits was about 1,200 m$$^{3}$$. This report compiled the photographs of the works from confirmation of stay water at August, 1997 by finish of measures of closing of the pits at September, 2000.

JAEA Reports

Measures of closing report of outside waste storage pits

; Ishibashi, Yuzo; Yoshida, Michihiro; Miyo, Hiroaki; Sukegawa, Yasuhiro*; *; Suzuki, Satoshi*

JNC TN8440 2000-020, 500 Pages, 2000/10

JNC-TN8440-2000-020.pdf:25.91MB

At outside waste storage pits, containers for storage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Thechnology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessary instruments started. Decontamination of the pits started from the begining of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the circumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition t0 above, the amount of concrete poured into the pits was about 1,200 m$$^{3}$$.

JAEA Reports

Core characteristic calculation on transportable deep sea reactor

PNC TN9410 96-070, 52 Pages, 1996/05

PNC-TN9410-96-070.pdf:1.33MB

Core characteristics calculations were performed on a trasportable deep sea reactor to confirm subcriticality at the state of thermalized neutron flux during a core flooded accident by sea water. The accident conditions were as follows. (1)A sea water leakage accident through a pressure hull occurred at deep sea. (2)The reactor was shut down by insertion of safety and control rods. (3)The primary loop boundary was damaged for some cause and the sea water entered into the core. Two types of fuel core were studied. One is an oxide fuel core using 50% Pu and 50% U of 20% enrichment. The other is a nitride fuel core using U of 97% enrichment like SP-100. The effect of wire spacer was also analysed. The computer program of MCNP was used for the analysis. Calculation results show that the subcriticality is kept by inserting a Re liner into a fuel pin even for the case with the wire spacer, where much volume of sea water exists in the core. The Re has good absorption effect for thermal neutrons. Thickness of the liner was estimated to be 0.15 ㎜ for the oxide fuel and 0.27 ㎜ for the nitride one.

JAEA Reports

None

*

PNC TN8410 90-067, 112 Pages, 1990/05

PNC-TN8410-90-067.pdf:0.09MB

None

Journal Articles

Mechanism of falling water limitation under counter-current flow through single vertical flow path

Sudo, Yukio;

Nihon Kikai Gakkai Rombunshu, B, 49(444), p.1685 - 1694, 1983/00

no abstracts in English

Oral presentation

Stabilizing and solidifications for Pu nitrate solution at TRP, 2; Safety improvement for Tsunami and Earthquake

Miyamoto, Masanori; Shirozu, Hidetomo; Morita, Minoru; Fujisaku, Sakae; Kurita, Tsutomu; Kimura, Yuichi; Kataoka, Satoshi; Seya, Katsunori*; Sasaki, Shunichi

no journal, , 

no abstracts in English